Objectives
Prepare the parts before vacuum treatment (PVD). Use a water recovery system while ensuring optimum quality in the washing tanks. Obtain a balance of harder water in the post-treatment dynamic washes and a balance of demineralized and ultra-demineralized water where the parts are washed before continuing the vacuum deposition process.
01.
Challenge
Demineralized water is not suitable for the PVD treatment preparation process. The customer in fact requires:
- “hard” water with an electrical conductivity around 250 μS for post-treatment preparation washes.
- demineralized water with an electrical conductivity around 7 μS in a dynamic wash where the parts are washed after having passed them through hard water.
- an ultra-demineralized water with an electrical conductivity of less than 1 μS in dynamic cascade washing where the parts are further washed before the actual PVD process.

02.
Project
In the accessories and surface finishing sector, the quality of water in washing processes is essential to guarantee optimal treatments. A leading company in Veneto, specialized in PVD (Physical Vapor Deposition) treatments, has implemented an entire treatment plant, including a vacuum evaporation system, to optimize water recovery and guarantee the necessary quality in the washing tanks.
03.
Solution
The entire system, including the vacuum evaporator, has allowed the recovery of 98% of the wastewater, ensuring recirculation and stabilization of conductivity. The water is treated with ion exchange and reverse osmosis to obtain the level of purity required in the various phases. The system has eliminated sewer discharges, reduced water consumption and optimized washing management.
Analysis of the results
The implementation of the system, including the vacuum evaporator, has led to tangible results in terms of efficiency and sustainability. 98% of the waste water was recovered and reused in the washing processes, drastically reducing the consumption of mains water. The total recirculation of the washings reached 6000 L/h, with an optimal balance between hard water (5000 L/h) and demineralized water (1000 L/h).
The company also achieved a zero discharge system, eliminating any emissions to the sewer system. The use of ion exchangers and reverse osmosis has allowed the water conductivity to be stabilized at 250 μS for post-treatment washes, 7 μS in intermediate washes and <1 μS for final washes, improving process quality and reducing waste.